UM = SF
Construction Cost Factor (CCF)
4.00/SF, based on data provided from TriService #3, deflated to FY04 $ using a deflation
factor of 0.97
Sustainment Cost Factor (SCF)
.41/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 5,425 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,068,725
Building GSFT: 5,425
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,847
,365
,247
,219
Unscheduled
,075
,607
,560
,519
Renewal &
Replacement:
,027
,349
,784
Total M&R Costs:
,923
,999
,156
,522
As % of replacement:
0.56%
0.84%
1.42%
1.74%
Per gsft:
||content||
.10
||content||
.65
.79
.41
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1089
Sq Ft
Lavatory, Vitreous China
7
Each
Clay Brick, Exterior, 2nd Floor
1089
Sq Ft
Service Sink, Iron Enamel
1
Each
Clay Brick, Exterior, 3rd+ Floor
384
Sq Ft
2
Each
Concrete, Painted, Exterior, 1st Floor
1081
Sq Ft
Tankless Water Closet
7
Each
Steel, Painted, Exterior Finish, 2nd Floor
860
Sq Ft
Urinal, Vitreous China
2
Each
Aluminum Fixed Window, 24 sf, 1st Floor
21
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Aluminum Fixed Window, 24 sf, 2nd Floor
24
Each
Pipe & Fittings, 2" Copper, Cold Water
0.6
K Ln Ft
Aluminum Operable Window, 12 sf, 1st Floor
5
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.6
K Ln Ft
Aluminum Operable Window, 12 sf, 2nd Floor
10
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.3
K Ln Ft
Aluminum Operable Window, 12 sf, 3rd+ Floor
10
Each
Pipe Insulation, Cold Water
0.9
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
5
Each
Water Heater, Electric 52 Gal.
1
Each
Steel Double 12'x24', Painted, Roll-up Door
2
Each
Water Storage Tank, 150 Gal.
1
Each
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Pipe & Fittings, 10" Cast Iron
0.1
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Metal Roof
1434
Sq Ft
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Single-Ply Modified Bituminous/Thermoplastic Roof
1537
Sq Ft
Roof Drain, 4-6"
1
Each
Steel, Painted, Interior Door
4
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
1
Each
Variable Air Volume Box
2
Each
Wood, Hollow Core, Painted, Interior Door
13
Each
Air Conditioner, Rooftop, 5 Ton
2
Each
Wood, Solid Core, Painted, Interior Door
12
Each
Fire Sprinkler Head
23
Each
Concrete Interior Steps
50
Sq Ft
Distribution Panel Board
1
Each
Metal Interior Railing, Painted
37
Ln Ft
Distribution Switch, Fused, <600 V
1
Each
Concrete Block, Painted, Interior Wall Finish
3090
Sq Ft
Motor Starter, 5-20 HP, <600 V
3
Each
Fabric Interior Wall Finish
1358
Sq Ft
Fluorescent Lighting Fixture, 160w
58
Each
Sheetrock, Unstippled, Interior Wall Finish
14480
Sq Ft
Metal Halide Lighting Fixture, High Bay, 400w
6
Each
Carpet, Nylon 20 oz., Low Traffic
2807
Sq Ft
Receptacle, 120V, 15 Amp
217
Each
Ceramic Tile Flooring
109
Sq Ft
Wiring Device, Switch
86
Each
Concrete, Finished Flooring
2111
Sq Ft
Annunciation Panel
1
Each
Terrazzo Flooring
293
Sq Ft
Fire Alarm Bell, 6"
2
Each
Vinyl Tile Flooring
54
Sq Ft
Fire Alarm Control Panel
1
Each
Acoustical Tile, Dropped, Ceiling
2405
Sq Ft
Manual Pull Station
1
Each
Metal Unpainted Interior Ceiling
1418
Sq Ft
Public Address Speaker
1
Each
Sheetrock, Unstippled, Ceiling
1552
Sq Ft
Smoke Detector
8
Each
Drinking Fountain, Refrigerated
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle