UM = SF
Construction Cost Factor (CCF)
.39/SF, based on data provided from TriService #9/4, deflated to FY04 $ using a deflation
factor of 0.97
Sustainment Cost Factor (SCF)
||content||
.05/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory as it applied to FAC 4422. Values shown are in FY04 $.
Replacement
Cost:
,006
Building GSFT: 2,221
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
3
3
0
5
Unscheduled
6
6
3
8
Renewal &
Replacement:
9
||content||
,707
Total M&R Costs:
9
6
||content||
,312
,330
As % of replacement:
0.91%
0.95%
1.88%
3.33%
Per gsft:
||content||
.05
Component
Quantity
UM
Aluminum Siding, Exterior, 1st Floor
2096
Sq Ft
Aluminum Siding, Exterior, 2nd Floor
2263
Sq Ft
Wood clapboards - 1st Floor
0
Sq Ft
Wood clapboards - 2d Floor
0
Sq Ft
Aluminum Fixed Window, 12 sf, 1st Floor
1
Each
Steel, Painted, Exterior Door
1
Each
Metal Roof
2221
Sq Ft
Steel, Painted, Interior Door
1
Each
Wood, Solid Core, Painted, Interior Door
2
Each
Concrete, Unfinished Flooring
2221
Sq Ft
Fluorescent Lighting Fixture, 160w
17
Each
Receptacle, 120V, 15 Amp
5
Each
Wiring Device, Switch
4
Each
Manual Pull Station
1
Each
Smoke Detector
4
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle