UM = SF
Construction Cost Factor (CCF)
1.09/SF, based on data provided from USACE, deflated to FY04 $ using a deflation factor of
0.985.
Sustainment Cost Factor (SCF)
.33/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,578 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,448,080
Building GSFT: 7,578
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,336
,820
,699
,648
Unscheduled
,423
,927
,886
,823
Renewal &
Replacement:
,406
,248
,754
Total M&R Costs:
,759
,153
,834
,225
As % of replacement:
0.61%
0.84%
1.44%
1.75%
Per gsft:
||content||
.16
||content||
.60
.75
.33
Quantit
Quantit
Component
y
UM
Component
y
UM
Clay Brick, Exterior, 1st Floor
1457
Sq Ft
Tankless Water Closet
10
Each
Clay Brick, Exterior, 2nd Floor
2991
Sq Ft
Urinal, Vitreous China
3
Each
Aluminum Fixed Window, 12 sf, 1st Floor
49
Each
Circulator Pump, 1/2 HP, Hot Water
1
Each
Aluminum Fixed Window, 12 sf, 2nd Floor
52
Each
Pipe & Fittings, 2" Copper, Cold Water
1
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
41
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.9
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.4
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Pipe Insulation, Cold Water
1.5
K Ln Ft
Steel, Painted, Exterior Door
3
Each
Pipe Insulation, Hot Water
0.1
K Ln Ft
Built-up Roof
2273
Sq Ft
Water Heater, Electric 52 Gal.
1
Each
Single-Ply Modified Bituminous/Thermoplastic Roof
2652
Sq Ft
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Steel, Painted, Interior Door
2
Each
Pipe & Fittings, 6" Cast Iron
0.6
K Ln Ft
Wood, Solid Core, Painted, Interior Door
40
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Concrete Interior Steps
38
Sq Ft
Roof Drain, 4-6"
2
Each
Metal Interior Railing, Painted
34
Ln Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Concrete Block, Painted, Interior Wall Finish
3131
Sq Ft
Variable Air Volume Box
7
Each
Fabric Interior Wall Finish
2809
Sq Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Sheetrock, Unstippled, Interior Wall Finish
15781
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
1
Each
Carpet, Nylon 20 oz., Low Traffic
4181
Sq Ft
Fire Sprinkler Head
40
Each
Concrete, Finished Flooring
2460
Sq Ft
Distribution Panel Board
3
Each
Terrazzo Flooring
716
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Vinyl Tile Flooring
221
Sq Ft
Motor Starter, 5-20 HP, <600 V
3
Each
Acoustical Tile, Dropped, Ceiling
5118
Sq Ft
Fluorescent Lighting Fixture, 160w
105
Each
Metal Ceiling, Painted
1983
Sq Ft
Receptacle, 120V, 15 Amp
381
Each
Sheetrock, Unstippled, Ceiling
477
Sq Ft
Wiring Device, Switch
148
Each
Drinking Fountain, Vitreous China
2
Each
Fire Alarm Bell, 6"
4
Each
Lavatory, Vitreous China
10
Each
Manual Pull Station
3
Each
Service Sink, Iron Enamel
1
Each
Smoke Detector
19
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle