UM = SF
Construction Cost Factor (CCF)
8.00/SF, based on data provided from TriService #11/1, deflated to FY04 $ using a deflation
factor of 0.97
Sustainment Cost Factor (SCF)
.36/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,107 SF. Values shown are in FY04 $.
Replacement
Cost:
0,055
Building GSFT: 7,107
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,173
,686
,591
,532
Unscheduled
,233
,835
,807
,739
Renewal &
Replacement:
||content||
,927
,267
,576
Total M&R Costs:
,405
,449
,665
,847
As % of replacement:
0.85%
1.17%
2.01%
2.44%
Per gsft:
||content||
.19
||content||
.61
.77
.36
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1008
Sq Ft
Tankless Water Closet
8
Each
Clay Brick, Exterior, 2nd Floor
1008
Sq Ft
Urinal, Vitreous China
3
Each
Concrete Block, Painted, Exterior, 1st Floor
2024
Sq Ft
Circulator Pump, 1/12 HP, Hot Water
1
Each
Concrete Block, Painted, Exterior, 2nd Floor
1875
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.9
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
31
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.8
K Ln Ft
Aluminum Fixed Window, 12 sf, 2nd Floor
34
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.4
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Pipe Insulation, Cold Water
1.2
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Pipe Insulation, Hot Water
0.2
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Water Heater, Electric 52 Gal.
1
Each
Built-up Roof
3554
Sq Ft
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Single-Ply Modified Bituminous/Thermoplastic Roof
1777
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.5
K Ln Ft
Steel, Painted, Interior Door
3
Each
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Wood, Solid Core, Painted, Interior Door
30
Each
Roof Drain, 4-6"
2
Each
Concrete Interior Steps
26
Sq Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Metal Interior Railing, Painted
23
Ln Ft
Variable Air Volume Box
4
Each
Concrete Block, Painted, Interior Wall Finish
5766
Sq Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Fabric Interior Wall Finish
1943
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
1
Each
Sheetrock, Unstippled, Interior Wall Finish
11592
Sq Ft
Fire Sprinkler Head
55
Each
Carpet, Nylon 20 oz., Low Traffic
2949
Sq Ft
Distribution Panel Board
3
Each
Concrete, Finished Flooring
3456
Sq Ft
Motor Starter, 5-20 HP, <600 V
2
Each
Terrazzo Flooring
480
Sq Ft
Fluorescent Lighting Fixture, 160w
77
Each
Vinyl Tile Flooring
222
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
6
Each
Acoustical Tile, Dropped, Ceiling
3518
Sq Ft
Receptacle, 120V, 15 Amp
280
Each
Metal Unpainted Interior Ceiling
3136
Sq Ft
Wiring Device, Switch
107
Each
Sheetrock, Unstippled, Ceiling
453
Sq Ft
Fire Alarm Bell, 6"
3
Each
Drinking Fountain, Refrigerated
2
Each
Fire Alarm Control Panel
1
Each
Lavatory, Vitreous China
10
Each
Manual Pull Station
3
Each
Service Sink, Iron Enamel
1
Each
Smoke Detector
14
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle