UM = EA
Construction Cost Factor (CCF)
,400.25/EA, based on data provided by Marshall & Swift, #61/8, for a welded steel pressure
tank 30,000 GA. Values were inflated to FY04 $ using the appropriate factors as published by OSD.
Sustainment Cost Factor (SCF)
0.16/EA, the sustainment factor was calculated using a ratio from FAC 1421 (1.24%) as no
other auditable data was available.