UM = SF
Construction Cost Factor (CCF)
.00/SF, based on data from TriService #9/4, and deflated to FY04 $ using deflation factor of
0.97.
Sustainment Cost Factor (SCF)
||content||
.81/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 38,662 SF. Values shown are in FY04 $.
Replacement
Cost:
,122,730
Building GSFT: 38,662
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,076
,757
,579
,286
Unscheduled
,459
,092
,997
,696
Renewal &
Replacement:
,678
,520
,785
Total M&R Costs:
,536
,527
,096
,767
As % of replacement:
1.08%
1.24%
1.86%
2.23%
Per gsft:
||content||
.50
||content||
.81
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
9441
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
1.5
K Ln Ft
Concrete Block, Painted, Exterior, 2nd Floor
8745
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.8
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
6
Each
Pipe Insulation, Cold Water
1.9
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
7
Each
Pipe Insulation, Hot Water
0.8
K Ln Ft
Steel, Painted, Exterior Door
3
Each
Water Heater, Electric 52 Gal.
1
Each
Built-up Roof
38662
Sq Ft
Pipe & Fittings, 10" Cast Iron
0.4
K Ln Ft
Steel, Painted, Interior Door
7
Each
Pipe & Fittings, 6" Cast Iron
0.9
K Ln Ft
Wood, Solid Core, Painted, Interior Door
14
Each
Pipe & Fittings, 4" DWV PVC
0.8
K Ln Ft
Concrete Block, Painted, Interior Wall Finish
21801
Sq Ft
Roof Drain, 4-6"
10
Each
Sheetrock, Unstippled, Interior Wall Finish
4449
Sq Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
2
Each
Carpet, Nylon 20 oz., Low Traffic
3093
Sq Ft
Variable Air Volume Box
8
Each
Concrete, Finished Flooring
34119
Sq Ft
Air Conditioner, Rooftop, 50 Ton
1
Each
Vinyl Tile Flooring
1450
Sq Ft
Suspended Heater, Hot Water, 4000 Cfm, 180 Mbh
2
Each
Acoustical Tile, Dropped, Ceiling
3093
Sq Ft
Fire Sprinkler Head
406
Each
Metal Unpainted Interior Ceiling
28000
Sq Ft
Distribution Switch, Fused, <600 V
2
Each
Sheetrock, Unstippled, Ceiling
1450
Sq Ft
Main Switchgear, <1200 Amp.
1
Each
Drinking Fountain, Refrigerated
2
Each
Motor Starter, 5-20 HP, <600 V
2
Each
Emergency Eye Wash
1
Each
Fluorescent Lighting Fixture, 160w
290
Each
Emergency Shower Station
1
Each
Receptacle, 120V, 15 Amp
174
Each
Lavatory, Vitreous China
8
Each
Wiring Device, Switch
44
Each
Service Sink, Iron Enamel
2
Each
Fire Alarm Bell, 6"
6
Each
Tankless Water Closet
5
Each
Fire Alarm Control Panel
1
Each
Urinal, Vitreous China
2
Each
Manual Pull Station
4
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Smoke Detector
77
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
1.9
Ft
Crane, Electric Bridge, <5 Ton
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle