UM = SY
Construction Cost Factor (CCF)
.33/SY, based on data provided by USACE and deflated to FY04 $ using deflation factor of
0.985.
Sustainment Cost Factor (SCF)
||content||
.16/SY, the sustainment factor was calculated using data from FAC 8512, as no
other auditable
data was available. As the inventory is typically open non-paved surfaces, sustainment was calculated to
be the same as for un-paved roads.