UM = SF
Construction Cost Factor (CCF)
.07/SF, based on data from USACE, and deflated to FY04 $ using deflation factor of 0.985.
Sustainment Cost Factor (SCF)
||content||
.77/SF, using the Whitestone MARS and a
component list derived from the DoD typical
inventory size of 6,482 SF. Values shown are in FY04 $.
Replacement
Cost:
Building GSFT: 6,482
5,856
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
3
3
7
3
Unscheduled
3
3
1
5
Renewal &
||content||
,309
,836
Replacement:
Total M&R Costs:
||content||
,187
||content||
,240
,527
,024
As % of replacement:
0.30%
0.31%
0.64%
1.27%
Per gsft:
Component
Quantity
UM
Aluminum Siding, Exterior, 1st Floor
3581
Sq Ft
Aluminum Siding, Exterior, 2nd Floor
3866
Sq Ft
Aluminum Fixed Window, 12 sf, 1st Floor
1
Each
Garage Door, Wood, Single Leaf
1
Each
Steel, Painted, Exterior Door
1
Each
Metal Roof
6482
Sq Ft
Concrete, Unfinished Flooring
6482
Sq Ft
Fluorescent Lighting Fixture, 160w
40
Each
Receptacle, 120V, 15 Amp
20
Each
Wiring Device, Switch
10
Each
Manual Pull Station
1
Each
Smoke Detector
4
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle