UM = SF
Construction Cost Factor (CCF)
0.00/SF, based on data provided from the TriService Committee, #4/3, deflated to FY04 $
using a deflation factor of 0.97.
Sustainment Cost Factor (SCF)
.78/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 6,627 SF. Values shown are in FY04 $.
Replacement
Cost:
6,084
Building GSFT: 6,627
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,395
,831
,653
,605
Unscheduled
,455
,913
,765
,710
Renewal &
Replacement:
,798
,944
,664
,730
Total M&R Costs:
,648
,688
,082
,045
As % of replacement:
1.41%
1.62%
2.28%
2.59%
Per gsft:
.06
.36
.33
.78
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
2690
Sq Ft
Service Sink, Iron Enamel
1
Each
Clay Brick, Exterior, 2nd Floor
2760
Sq Ft
Tankless Water Closet
5
Each
Stairs, Exterior and Decking
222
Sq Ft
Urinal, Vitreous China
2
Each
Aluminum Fixed Window, 12 sf, 1st Floor
16
Each
Circulator Pump, 1/6 HP, Hot Water
1
Each
Aluminum Fixed Window, 12 sf, 2nd Floor
13
Each
Pipe & Fittings, 2" Copper, Cold Water
0.5
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
1
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.5
K Ln Ft
Steel, Painted, Exterior Door
6
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.4
K Ln Ft
Asphalt Shingle Roof
3660
Sq Ft
Pipe Insulation, Cold Water
0.7
K Ln Ft
Steel, Painted, Interior Door
2
Each
Pipe Insulation, Hot Water
0.4
K Ln Ft
Wood, Solid Core, Painted, Interior Door
37
Each
Water Heater, Gas/Oil 75 Gph
1
Each
Concrete Interior Steps
600
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.1
K Ln Ft
Metal Interior Railing, Painted
160
Ln Ft
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Paneling
1510
Sq Ft
Pipe & Fittings, 4" Steel, Gas
0.4
K Ln Ft
Concrete Block, Painted, Interior Wall Finish
520
Sq Ft
Variable Air Volume Box
4
Each
Fabric Interior Wall Finish
1000
Sq Ft
Air Conditioner, Rooftop, 5 Ton
4
Each
Plaster Interior Wall Finish
1510
Sq Ft
Fire Sprinkler Head
23
Each
Sheetrock, Unstippled, Interior Wall Finish
7930
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Carpet, Nylon 20 oz., Low Traffic
2130
Sq Ft
Distribution Panel Board
2
Each
Concrete, Finished Flooring
164
Sq Ft
Motor Starter, 5-20 HP, <600 V
4
Each
Terrazzo Flooring
1116
Sq Ft
Fluorescent Lighting Fixture, 160w
50
Each
Vinyl Tile Flooring
1820
Sq Ft
Receptacle, 120V, 15 Amp
72
Each
Acoustical Tile, Dropped, Ceiling
4090
Sq Ft
Wiring Device, Switch
29
Each
Plaster Ceiling
164
Sq Ft
Fire Alarm Bell, 6"
2
Each
Sheetrock, Unstippled, Ceiling
840
Sq Ft
Fire Alarm Control Panel
1
Each
Drinking Fountain, Refrigerated
1
Each
Manual Pull Station
3
Each
Lavatory, Vitreous China
5
Each
Smoke Detector
30
Each
Annual Sustainment Costs
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle