UM = SF
Construction Cost Factor (CCF)
5.20/SF, based on data provided from the TriService Committee, #4/2, deflated to FY04 $
using a deflation factor of 0.97.
Sustainment Cost Factor (SCF)
.19/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,602 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,145,697
Building GSFT: 7,602
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,362
,702
,531
,467
Unscheduled
,320
,740
,600
,529
Renewal &
Replacement:
,147
,382
,746
,889
Total M&R Costs:
,829
,824
,876
,884
As % of replacement:
1.38%
1.55%
2.34%
2.78%
Per gsft:
.08
.34
.53
.19
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
2880
Sq Ft
Tankless Water Closet
5
Each
Clay Brick, Exterior, 2nd Floor
2940
Sq Ft
Urinal, Vitreous China
2
Each
Stairs, Exterior and Decking
253
Sq Ft
Circulator Pump, 1/6 HP, Hot Water
1
Each
Aluminum Fixed Window, 12 sf, 1st Floor
14
Each
Pipe & Fittings, 2" Copper, Cold Water
1
K Ln Ft
Aluminum Fixed Window, 12 sf, 2nd Floor
17
Each
Pipe & Fittings, 3/4" Copper, Cold Water
1
K Ln Ft
Steel w/ Safety Glass, Painted, Exterior Door
2
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.5
K Ln Ft
Steel, Painted, Exterior Door
5
Each
Pipe Insulation, Cold Water
1
K Ln Ft
Asphalt Shingle Roof
4200
Sq Ft
Water Heater, Gas/Oil 75 Gph
1
Each
Aluminum Frame, Fully Glazed, Interior Door
2
Each
Pipe & Fittings, 6" Cast Iron
1
K Ln Ft
Steel, Painted, Interior Door
1
Each
Pipe & Fittings, 4" DWV PVC
0.3
K Ln Ft
Wood, Solid Core, Painted, Interior Door
40
Each
Roof Drain, 4-6"
2
Each
Concrete Interior Steps
600
Sq Ft
Pipe & Fittings, 4" Steel, Gas
1
K Ln Ft
Metal Interior Railing, Painted
160
Ln Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Paneling
1620
Sq Ft
Variable Air Volume Box
8
Each
Ceramic Tile Wall Finish
1080
Sq Ft
Air Conditioner, Rooftop, 20 Ton
2
Each
Concrete Block, Painted, Interior Wall Finish
560
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
4
Each
Plaster Interior Wall Finish
1620
Sq Ft
Fire Sprinkler Head
26
Each
Sheetrock, Unstippled, Interior Wall Finish
8510
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Carpet, Nylon 20 oz., Low Traffic
2440
Sq Ft
Distribution Panel Board
2
Each
Concrete, Finished Flooring
188
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Terrazzo Flooring
1278
Sq Ft
Motor Starter, 5-20 HP, <600 V
2
Each
Vinyl Tile Flooring
2092
Sq Ft
Fluorescent Lighting Fixture, 160w
58
Each
Acoustical Tile, Dropped, Ceiling
4690
Sq Ft
Receptacle, 120V, 15 Amp
77
Each
Plaster Ceiling
188
Sq Ft
Wiring Device, Switch
31
Each
Sheetrock, Unstippled, Ceiling
960
Sq Ft
Fire Alarm Bell, 6"
2
Each
Drinking Fountain, Refrigerated
1
Each
Fire Alarm Control Panel
1
Each
Lavatory, Vitreous China
6
Each
Manual Pull Station
3
Each
Service Sink, Iron Enamel
1
Each
Smoke Detector
30
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle