UM = SF
Construction Cost Factor (CCF)
.33/SF, based on data provided from the TriService Committee, #19/1 & 2, deflated to FY04 $
using a deflation factor of 0.97.
Sustainment Cost Factor (SCF)
||content||
.72/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 3,425 SF. This average value represents a two-family duplex dwelling unit. Values
shown are in FY04 $.
Replacement
Cost:
Building GSFT: 3,425
6,805
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
||content||
,714
Unscheduled
||content||
,863
Renewal & Replacement:
Total M&R Costs:
,173
As % of replacement:
2.18%
Per gsft:
||content||
.72
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1,320
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
0.40
K Ln Ft
Aluminum Siding, Exterior, 2nd Floor
1,320
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.40
K Ln Ft
Stairs, Exterior and Decking
174
Sq Ft
Pipe Insulation, Cold Water
0.60
K Ln Ft
Aluminum Operative Window, 12 sf, 1st Floor
17
Each
Water Heater, Electric 52 Gal.
2
Each
Aluminum Operative Window, 12 sf, 2nd Floor
10
Each
Pipe & Fittings, 6" Cast Iron
0.50
K Ln Ft
Wood, Solid Core, Painted, Exterior Door
6
Each
Aluminum Gutter, Downspouts, Fittings
0.20
K Ln Ft
Asphalt Shingle Roof
1,700
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
2
Each
Wood, Hollow Core, Painted, Interior Door
18
Each
Heat Pump, 5 Ton
1
Each
Wooden Interior Stair Railing
16
Sq Ft
Distribution Panel Board
2
Each
Wood Stairs, Exterior
220
Sq Ft
Fluorescent Lighting Fixture, 160w
2
Each
Wood Steps, Interior
30
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
20
Each
Ceramic Tile Wall Finish
1,070
Sq Ft
Receptacle, 120V, 15 Amp
26
Each
Sheetrock, Unstippled, Interior Wall Finish
5,054
Sq Ft
Wiring Device, Switch
20
Each
Ceramic Tile Flooring
80
Sq Ft
Smoke Detector
10
Each
Concrete, Finished Flooring
615
Sq Ft
Lavatory, Vitreous China
4
Each
Vinyl Tile Flooring
880
Sq Ft
Service Sink, Iron Enamel
2
Each
Wood Parquetry Flooring
930
Sq Ft
Flush Tank Water Closet
4
Each
Sheetrock, Unstippled, Ceiling
1,900
Sq Ft
Shower, Ceramic Tile
2
Each
2
Each
Pipe Insulation, Hot Water
0.40
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
.00
1
4
7
10 13 16 19 22 25 28 31 34 37 40 43 46 49
50 Year Life Cycle