UM = FA
Construction Cost Factor (CCF)
,080.15/FA, based on data provided by Marshall & Swift for a "Good" Prefabricated Housing
unit, and inflated to FY04 $.
Sustainment Cost Factor (SCF)
1.96/FA, the sustainment factor was calculated using a ratio from FAC 7110 (2.45%) as no
other auditable data was available.
No Layout Available