UM = FA
Construction Cost Factor (CCF)
,272.44/FA, based on data provided by USACE and RS Means, and inflated to FY04 $.
Sustainment Cost Factor (SCF)
5.00/FA, the sustainment factor was calculated using a ratio from FAC 8526 as no other
auditable data was available.
No Layout Available