UM = SF
Construction Cost Factor (CCF)
.54/SF, based on data provided from the AFCESA and inflated to FY04 $.
Sustainment Cost Factor (SCF)
||content||
.50/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 150 SF. Values shown are in FY04 $.
Replacement
Cost:
Building GSFT: 150
,431
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
Unscheduled
Renewal &
Replacement:
Total M&R Costs:
8
5
As % of replacement:
0.68%
0.73%
1.32%
1.67%
Per gsft:
||content||
.19
||content||
.50
Component
Quantity
UM
Wood Shingles, Unfinished- 1st Floor
400
Sq Ft
Wood, Solid Core, Painted, Exterior Door
1
Each
Asphalt Shingle Roof
150
Sq Ft
Concrete, Unfinished Flooring
150
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
1
Each
Receptacle, 120V, 15 Amp
2
Each
Wiring Device, Switch
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle