UM = SF
Construction Cost Factor (CCF)
5.00/SF, based on data from TriService #13, and deflated to FY04 $ using a deflation factor of
0.97.
Sustainment Cost Factor (SCF)
. 46/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 8,427 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,245,089
Building GSFT: 8,427
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,125
,376
,080
,989
Unscheduled
,946
,080
,892
,775
Renewal &
Replacement:
,421
,994
,222
Total M&R Costs:
,070
,877
,967
,986
As % of replacement:
1.05%
1.59%
2.73%
3.69%
Per gsft:
||content||
.55
.35
.03
.46
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
3600
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
2.5
K Ln Ft
Clay Brick, Exterior, 2nd Floor
3600
Sq Ft
Pipe Insulation, Cold Water
2
K Ln Ft
Stairs, Exterior and Decking
90
Sq Ft
Pipe Insulation, Hot Water
2.5
K Ln Ft
Aluminum Fixed Window, 24 sf, 1st Floor
2
Each
Water Heater, Gas/Oil 175 Gph
2
Each
Aluminum Operable Window, 24 sf, 1st Floor
16
Each
Water Storage Tank, 500 Gal.
1
Each
Aluminum Operable Window, 24 sf, 2nd Floor
16
Each
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
4
Each
Pipe & Fittings, 6" Cast Iron
0.7
K Ln Ft
Steel, Painted, Exterior Door
4
Each
Pipe & Fittings, 4" DWV PVC
0.4
K Ln Ft
Built-up Roof
5249
Sq Ft
Roof Drain, 4-6"
2
Each
Wood, Solid Core, Painted, Interior Door
75
Each
Pipe & Fittings, 3/4" Copper, High Temp.
0.5
K Ln Ft
Masonry Interior Steps, Unpainted
264
Sq Ft
Variable Air Volume Box
4
Each
Metal Interior Railing, Painted
96
Ln Ft
Air Conditioner, Rooftop, 20 Ton
2
Each
Ceramic Tile Wall Finish
4380
Sq Ft
Fire Sprinkler Head
45
Each
Sheetrock, Unstippled, Interior Wall Finish
18670
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Vinyl Interior Wall Finish
3200
Sq Ft
Main Switchgear, <1200 Amp.
1
Each
Carpet, Nylon 20 oz., High Traffic
4455
Sq Ft
Motor Starter, 5-20 HP, <600 V
2
Each
Ceramic Tile Flooring
817
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
4
Each
Concrete, Finished Flooring
135
Sq Ft
Exit Lighting Fixture, w/ Battery
4
Each
Sheetrock, Unstippled, Ceiling
5400
Sq Ft
Fluorescent Lighting Fixture, 160w
42
Each
16
Each
Incandescent Lighting Fixture, Basic, 100w
35
Each
Drinking Fountain, Refrigerated
1
Each
Metal Halide Lighting Fixture, Wall Mount, 150w
16
Each
Flush Tank Water Closet
17
Each
Receptacle, 120V, 15 Amp
164
Each
Lavatory, Vitreous China
17
Each
Wiring Device, Switch
80
Each
Service Sink, Iron Enamel
2
Each
Fire Alarm Bell, 6"
2
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Fire Alarm Control Panel
1
Each
Circulator Pump, 1/2 HP, Hot Water
1
Each
Manual Pull Station
6
Each
Pipe & Fittings, 2" Copper, Cold Water
2.2
K Ln Ft
Smoke Detector
27
Each
Pipe & Fittings, 3/4" Copper, Cold Water
2
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle