UM = SF
Construction Cost Factor (CCF)
.80/SF, based on data provided from USACE. A notional EA has been defined as the area
56.89 SY covered by a GP Medium tent, with a concrete slab and appropriate drainage. Values were
adjusted to FY04$ using the appropriate deflation factor.
Sustainment Cost Factor (SCF)
||content||
.14/SF, the sustainment factor was calculated using a
ratio from FAC 8526, as no
other
auditable data was available.