UM = SF
Construction Cost Factor (CCF)
8.71/SF, based on data from TriService #27, and deflated to FY04 $ using a deflation factor of
0.97.
Sustainment Cost Factor (SCF)
. 88/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 13,663 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,897,654
Building GSFT: 13,663
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,755
,668
,251
,150
Unscheduled
,197
,746
,515
,391
Renewal &
Replacement:
,022
,971
,262
,169
Total M&R Costs:
,974
,385
,027
,710
As % of replacement:
1.47%
2.02%
3.11%
3.51%
Per gsft:
.05
.81
.32
.88
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
2440
Sq Ft
Pipe Insulation, Cold Water
1.4
K Ln Ft
Clay Brick, Exterior, 2nd Floor
2440
Sq Ft
Pipe Insulation, Hot Water
0.7
K Ln Ft
Clay Brick, Exterior, 3rd+ Floor
2443
Sq Ft
Water Heater, Gas/Oil 175 Gph
1
Each
Aluminum Fixed Window, 12 sf, 1st Floor
49
Each
Pipe & Fittings, 10" Cast Iron
0.1
K Ln Ft
Aluminum Fixed Window, 12 sf, 2nd Floor
67
Each
Pipe & Fittings, 6" Cast Iron
0.4
K Ln Ft
Aluminum Fixed Window, 12 sf, 3rd+ Floor
67
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
1
Each
Roof Drain, 4-6"
2
Each
Steel, Painted, Exterior Door
6
Each
Pipe & Fittings, 4" Steel, Gas
0.7
K Ln Ft
Single-Ply Modified Bituminous/Thermoplastic Roof
4558
Sq Ft
Chemical Feed System
1
Each
Wood, Hollow Core, Painted, Interior Door
82
Each
Circulation Pump 5 HP, Hot Water
1
Each
Wood, Solid Core, Painted, Interior Door
62
Each
Expansion Tank, 60 Gal.
1
Each
Concrete Interior Steps
246
Sq Ft
Gas Boiler, 750 Mbh
1
Each
Metal Interior Railing, Painted
89
Ln Ft
Chiller, Reciprocal Air-Cooled Hermetic, 40 Ton
1
Each
Concrete Block, Painted, Interior Wall Finish
2055
Sq Ft
Circulation Pump, 5 HP, Chiller & Condenser Water
1
Each
Sheetrock, Unstippled, Interior Wall Finish
44718
Sq Ft
1
Each
Carpet, Nylon 20 oz., Low Traffic
11887
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
36
Each
Ceramic Tile Flooring
1093
Sq Ft
Fire Sprinkler Head
68
Each
Concrete, Finished Flooring
683
Sq Ft
Distribution Switch, Fused, <600 V
2
Each
Sheetrock, Unstippled, Ceiling
13663
Sq Ft
Main Switchgear, <1200 Amp.
1
Each
Elevator, Hydraulic, 2500 lbs, 3-5 Floor, 200 fpm
1
Each
Motor Starter, 21-50 HP, <600 V
1
Each
Drinking Fountain, Refrigerated
3
Each
Motor Starter, 5-20 HP, <600 V
2
Each
Lavatory, Vitreous China
32
Each
Fluorescent Lighting Fixture, 160w
128
Each
Service Sink, Iron Enamel
3
Each
Receptacle, 120V, 15 Amp
185
Each
32
Each
Wiring Device, Switch
74
Each
Tankless Water Closet
32
Each
Fire Alarm Bell, 6"
3
Each
Circulator Pump, 1/2 HP, Hot Water
1
Each
Fire Alarm Control Panel
1
Each
Pipe & Fittings, 2" Copper, Cold Water
1.5
K Ln Ft
Manual Pull Station
3
Each
Pipe & Fittings, 3/4" Copper, Cold Water
1.2
K Ln Ft
Smoke Detector
33
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.7
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle