UM = SF
Construction Cost Factor (CCF)
.81/SF, based on data from Marshall & Swift, #17/49 Farm Labor Housing/Dorms, Class C -
Good and inflated to FY04 $ using appropriate factors.
Sustainment Cost Factor (SCF)
||content||
.22/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 1,376 SF. Values shown are in FY04 $.
Replacement
Cost:
,395
Building GSFT: 1,376
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
4
5
3
5
Unscheduled
7
5
3
4
Renewal &
Replacement:
2
6
Total M&R Costs:
2
2
||content||
,377
||content||
,676
As % of replacement:
1.89%
2.01%
3.25%
3.95%
Per gsft:
||content||
.00
||content||
.22
Component
Quantity
UM
Aluminum Siding, Exterior, 1st Floor
1650
Sq Ft
Aluminum Siding, Exterior, 2nd Floor
1781
Sq Ft
Wood, Solid Core, Painted, Exterior Door
2
Each
Asphalt Shingle Roof
1376
Sq Ft
Wood, Hollow Core, Painted, Interior Door
6
Each
Concrete, Unfinished Flooring
1266
Sq Ft
Incandescent Lighting Fixture, Basic, 100w
8
Each
Receptacle, 120V, 15 Amp
8
Each
Wiring Device, Switch
4
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle