Project Name
Project No. ___________
UFC 4-214-02, TEMF, 24 July 03
SITE DESIGN
Drawing Type / Scale
Show This Information
Utility Plan
All site utility requirements.
1:500
Site lighting.
Primary cable routing (new and existing).
Cable television and telephone routing.
Off-Site Electrical Plan
Location of primary supply point of take-off.
1:500
Existing electrical lines, both overhead and
Scale as required
underground, properly identified.
(If applicable)
New construction tie-in to on-site electrical distribution system.
Note1: Drawings shall be dimensioned to show building separations, set back, etc.
00110 - 16