Project Name
Project No. ___________
UFC 4-214-02, TEMF, 24 July 03
detailed analysis on the final design which meets or exceeds the preliminary ranking established at
proposal level. Proposals must score at least a Bronze SPiRiT Level or a Certified LEED Level.
(7) Evaluation Factors/Proposal Contents Listing. A spreadsheet or table consisting of all the evaluation
categories and sub-categories listed in Section 0120 for technical proposal evaluation and specific
reference to where in the proposal documents those requirements are addressed or indicated. Submit
as part of the Design-Technical Information.
4.0 RESTRICTIONS
a. Incomplete proposals. Failure to submit all the data indicated in this section may be cause for
determining a proposal incomplete and, therefore, not considered for technical evaluation in Phase 2, or
for subsequent award.
00110 - 19