UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
(d) Does the Offeror's floor plan demonstrate compliance with the mandatory requirements for
furnishings while allowing suitable space for circulation and other requirements?
(e)
Does the Offeror's floor plan allow for suitable work flow and access necessary to successfully
operate this facility in accordance with it's mission.
(1C) Battalion Headquarters Facility
(a) Does the building floor plan provide space arrangement well suited to the mission of the facility?
(b) Does the building floor plan provide acceptable life safety and fire safety measures?
Is the Life
Safety Analysis for the facility acceptable and in conformance with the Statement of Work requirements?
(c) Evaluate the Offeror's floor plan with respect to the functional and spatial relationship requirements
established in the Statement of Work.
(d) Does the Offeror's floor plan demonstrate compliance with the mandatory requirements for
furnishings while allowing suitable space for circulation and other requirements?
(e)
Does the Offeror's floor plan allow for suitable work flow and access necessary to successfully
operate this facility in accordance with it's mission.
(1D) Brigade Headquarters Facility
(a) Does the building floor plan provide space arrangement well suited to the mission of the facility?
(b) Does the building floor plan provide acceptable life safety and fire safety measures?
Is the Life
Safety Analysis for the facility acceptable and in conformance with the Statement of Work requirements?
(c) Evaluate the Offeror's floor plan with respect to the functional and spatial relationship requirements
established in the Statement of Work.
(d) Does the Offeror's floor plan demonstrate compliance with the mandatory requirements for
furnishings while allowing suitable space for circulation and other requirements?
(e)
Does the Offeror's floor plan allow for suitable work flow and access necessary to successfully
operate this facility in accordance with it's mission.
d.
Building Asthetics. The following items will be considered, materials will be evaluated in Factor 2-
2.
(1) Exterior Considerations:
(a)
Facades, roof lines, and delineation of entrances.
(b)
(c)
Shadow effects, materials, and textures.
(d)
(e)
Compliance with Installation Design Guide Recommendations
(f)
Conformance to adjacent structures architectural styles
(g)
Exterior color schemes proposed.
(h)
Other aesthetic considerations.
(2) Interior Considerations:
(a) Are the proposed colors and details conducive to the mission of the facility?
(b) Do the proposed materials and finishes represent a positive working environment?
(c) Have the ceiling heights, hallway widths, and other space sizes and configurations provided develop
a workable solution to the facility mission?
(d) Does the interior design package provide for an interesting, attractive environment?
(e) Is the interior system and finishes proposed suitable for use in a facility where the primary occupants
are soldiers? Are these systems suitable for a heavy usage environment?
FACTOR 2-2: BUILDING SYSTEMS.