UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
3.5.6 The SID Binder shall include the following information at each design submittal in this order:
=============================================================================
SEQUENCE OF SID SUBMITTAL
1.
Title page
2.
Table of contents
3.
Design objectives - A statement of design objectives explaining the interior design philosophy
of the facility shall be provided in the SID. Design objectives and the proposed method of
accomplishing the objectives. Shall cover, when applicable, energy efficiency, safety, health,
maintenance, image, personal performance of occupants and functional flexibility.
4.
Interior floor plan
5.
Interior sample finish boards
Scheme A
Scheme B
Scheme C
Example all restrooms could be noted as color scheme "A", all general open office finishes could be
noted as color scheme "B" and the main lobby could be noted as color scheme "C".
6.
Room finish schedule
7.
Signage
8.
Signage plan
9.
Prewired workstation composite floor plans
10.
Prewired workstation typicals - elevations and component inventory.
11.
Prewired workstation panel identification plan with electrical outlet placement including base
feed.
12.
Integration and layout of ACSIM specific furniture. Plan must show suitability of proposed
space to suit the furniture to be provided.
============================================================================
S