Project Name
Project No. ___________
UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
9.4
The uses of Reference files and Xrefs during the design stage is up to the discretion of the
designers. All CADD files at Design Complete submittal shall be free standing, independent files, and
not supported by reference files. All Reference files (MicroStation) and all Xrefs files (AutoCAD) shall
be removed at Design Complete submittal.
9.5
Submit all Design Complete CADD files on the following media.
-
Read/Write CD-ROM Disk
10.0 SPECIFICATIONS
10.1 The Contractor shall submit marked-up and final specifications as required. The specifications
may be any one of the major, well known master guide specification sources such as MASTERSPEC
from the American Institute of Architects, SPECTEXT from Construction Specification Institute or
Corps of Engineers Guide Specifications, etc. Use only one source for the project. Edit the
specifications for this project and submit in marked-up or redlined draft version at the Final Review
submittal stage. If the design is based on a specific product, the specification shall consist of the
important features of the product. The specification shall be detailed enough such that another
product meeting the specification could be substituted and it would not adversely impact the project.
After incorporation of comments, submit a final, design complete specification package. Delete all
marked-out or redlined text and type in all inserted text.
10.2 Submittal Register. Develop the submittal requirements during construction during the design
phase of the contract, by producing a Contractor Submittal Register during design. Attach a submittal
register to each section of the specifications for the submittal requirements of that section. Prepare
the Submittal Register on ENG Form 4288. The Contractor shall be responsible for listing all required
submittals necessary to insure the project requirements are complied with. The Register shall identify
submittal items such as shop drawings, manufacturer's literature, certificates of compliance, material
samples, guarantees, test results, etc that the Contractor shall submit for review and/or approval
action during the life of the construction contract. The Contractor shall place all the Submittal Register
pages in an appendix of the final specifications.
11.0
CONTENTS OF DESIGN SUBMITTALS
11.1
The First Site/Utility Design Submittal 100% shall contain as a minimum, the following:
11.1.1 General Narratives:
11.1.1.1 Site/Layout: Explanation of objectives and factors influencing siting decisions. General
overview of major site features planned, such as building orientation, drainage patterns, parking
provisions, traffic circulation, provisions for the handicapped, security requirements, etc. Rationale for
locating major site elements. Set back requirements or specific clearance requirements. Locations of
borrow and spoil areas.
11.1.1.2 Utility Systems: Design narrative for the natural gas, water supply, storm drainage, and
wastewater systems relating to this project. Include an analysis of the existing distribution systems
capability to supply sufficient quantity at adequate levels. If the existing distribution systems are
inadequate, provide the design solution to augment the systems to provide the requirements for the
new facilities.
11.2 All drawings included in the required technical data for the proposal submission (see SECTION
00110A: PHASE 2 TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS), shall be
developed to 100 percent completion. In addition to the individual utility plans, submit a combined
utility plan drawn to the same scale as the individual utility plans.
11.2.1 General Site Layout: Scale shall be included.
S
ection 01012 - Page 8