UM = SF
Construction Cost Factor (CCF)
2.14/SF, based on data provided by USACE, and deflated to FY04 $ using a deflation factor of
0.985
Sustainment Cost Factor (SCF)
.53/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,315 SF. Values shown are in FY04 $.
Replacement
Cost:
3,454
Building GSFT: 7,315
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,017
,603
,569
,533
Unscheduled
,046
,734
,778
,722
Renewal &
Replacement:
||content||
,117
,860
,223
Total M&R Costs:
,063
,454
,207
,478
As % of replacement:
0.68%
0.94%
1.59%
2.07%
Per gsft:
||content||
.16
||content||
.94
.53
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
3585
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
K Ln Ft
Steel, Painted, Exterior Finish, 2nd Floor
2854
Sq Ft
Pipe Insulation, Cold Water
0.2
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
16
Each
Water Heater, Electric 52 Gal.
1
Each
Steel Double 12'x24', Painted, Roll-up Door
4
Each
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Metal Roof
5524
Sq Ft
Roof Drain, 4-6"
2
Each
Steel, Painted, Interior Door
11
Each
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
2
Each
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Concrete Interior Steps
39
Sq Ft
Variable Air Volume Box
3
Each
Metal Interior Railing, Painted
24
Ln Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete Block, Painted, Interior Wall Finish
6642
Sq Ft
Fire Sprinkler Head
22
Each
Concrete, Finished Flooring
7120
Sq Ft
Distribution Panel Board
2
Each
Acoustical Tile, Dropped, Ceiling
1658
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Metal Unpainted Interior Ceiling
5462
Sq Ft
Motor Starter, 5-20 HP, <600 V
3
Each
Drinking Fountain, Refrigerated
1
Each
Fluorescent Lighting Fixture, 160w
59
Each
Emergency Eye Wash
1
Each
Metal Halide Lighting Fixture, High Bay, 400w
9
Each
Lavatory, Vitreous China
4
Each
Receptacle, 120V, 15 Amp
60
Each
Service Sink, Iron Enamel
1
Each
Wiring Device, Switch
23
Each
2
Each
Fire Alarm Bell, 6"
2
Each
Tankless Water Closet
4
Each
Fire Alarm Control Panel
1
Each
Urinal, Vitreous China
1
Each
Manual Pull Station
4
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
0.2
Ft
Crane, Electric Bridge, <5 Ton
1
Each
K Ln
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle