UM = SF
Construction Cost Factor (CCF)
1.99/SF, based on data provided from USACE, and deflated to FY04 $ using a deflation factor
of 0.985
Sustainment Cost Factor (SCF)
.86/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 4,792 SF. Values shown are in FY04 $.
Replacement
Cost:
2,496
Building GSFT: 4,792
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,452
,933
,958
,917
Unscheduled
,375
,028
,107
,052
Renewal &
Replacement:
||content||
,106
,403
,725
Total M&R Costs:
,827
,067
,468
,694
As % of replacement:
0.76%
1.12%
1.65%
2.16%
Per gsft:
||content||
.00
||content||
.47
.18
.86
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1220
Sq Ft
Urinal, Vitreous China
2
Each
Concrete Block, Painted, Exterior, 1st Floor
2031
Sq Ft
Circulator Pump, 1/12 HP, Hot Water
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
1617
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.4
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
7
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.3
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
41
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
2
Each
Pipe Insulation, Cold Water
0.3
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Pipe Insulation, Hot Water
0.2
K Ln Ft
Built-up Roof
1438
Sq Ft
Water Heater, Electric 52 Gal.
1
Each
Metal Roof
2533
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Steel, Painted, Interior Door
7
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Wood Frame, Fully Glazed, Painted, Interior Door
1
Each
Roof Drain, 4-6"
1
Each
Wood, Solid Core, Painted, Interior Door
1
Each
1
Each
Concrete Interior Steps
18
Sq Ft
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Metal Interior Railing, Painted
13
Ln Ft
Exhaust Fan, Roof Mounted, 1000 Cfm
1
Each
Concrete Block, Painted, Interior Wall Finish
4996
Sq Ft
Variable Air Volume Box
2
Each
Sheetrock, Unstippled, Interior Wall Finish
319
Sq Ft
Air Conditioner, Rooftop, 5 Ton
1
Each
Carpet, Nylon 20 oz., Low Traffic
128
Sq Ft
Fire Sprinkler Head
19
Each
Concrete, Finished Flooring
4519
Sq Ft
Distribution Panel Board
3
Each
Vinyl Tile Flooring
56
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Acoustical Tile, Dropped, Ceiling
944
Sq Ft
Motor Starter, 5-20 HP, <600 V
1
Each
Metal Ceiling, Painted
1254
Sq Ft
Fluorescent Lighting Fixture, 160w
46
Each
Metal Unpainted Interior Ceiling
2505
Sq Ft
Metal Halide Lighting Fixture, High Bay, 400w
4
Each
Drinking Fountain, Refrigerated
1
Each
Receptacle, 120V, 15 Amp
58
Each
Emergency Eye Wash
1
Each
Wiring Device, Switch
19
Each
Lavatory, Vitreous China
5
Each
Fire Alarm Bell, 6"
2
Each
Service Sink, Iron Enamel
1
Each
Manual Pull Station
3
Each
1
Each
Smoke Detector
5
Each
Tankless Water Closet
4
Each
Crane, Electric Bridge, <5 Ton
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle