UM = SF
Construction Cost Factor (CCF)
5.78/SF, based on data provided from USACE, and deflated to FY04 $ using a deflation factor
of 0.985
Sustainment Cost Factor (SCF)
||content||
.98/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 6,721 SF. Values shown are in FY04 $.
Replacement
Building GSFT:
Cost:
15,018
,142,768
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,435
,403
,197
,171
Unscheduled
,604
,592
,491
,432
Renewal &
Replacement:
||content||
,574
,261
,143
Total M&R Costs:
,039
,569
,948
,747
As % of replacement:
0.52%
0.68%
1.08%
1.39%
Per gsft:
||content||
.53
||content||
.98
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
5137
Sq Ft
Water Heater, Gas/Oil 75 Gph
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
4090
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
23
Each
Pipe & Fittings, 4" DWV PVC
0.4
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
4
Each
Roof Drain, 4-6"
4
Each
Steel, Painted, Exterior Door
4
Each
Sump Pump, 3 HP
1
Each
Metal Roof
11342
Sq Ft
1
Each
Steel, Painted, Interior Door
16
Each
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Wood Frame, Fully Glazed, Painted, Interior Door
3
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
6
Each
Concrete Interior Steps
80
Sq Ft
Variable Air Volume Box
6
Each
Metal Interior Railing, Painted
34
Ln Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete Block, Painted, Interior Wall Finish
9516
Sq Ft
Direct Digital Controls, System Points
1
Each
Concrete, Finished Flooring
14618
Sq Ft
Fire Sprinkler Head
46
Each
Acoustical Tile, Dropped, Ceiling
3404
Sq Ft
Distribution Panel Board
2
Each
Metal Unpainted Interior Ceiling
11213
Sq Ft
Distribution Switch, Fused, <600 V
2
Each
Drinking Fountain, Refrigerated
1
Each
Motor Starter, 5-20 HP, <600 V
8
Each
Emergency Eye Wash
1
Each
Fluorescent Lighting Fixture, 160w
120
Each
Metal Halide Lighting Fixture, High Bay,
Lavatory, Vitreous China
6
Each
400w
18
Each
Service Sink, Iron Enamel
1
Each
Receptacle, 120V, 15 Amp
86
Each
3
Each
Wiring Device, Switch
33
Each
Tankless Water Closet
6
Each
Fire Alarm Bell, 6"
4
Each
Urinal, Vitreous China
1
Each
Fire Alarm Control Panel
1
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
0.3
Ft
Manual Pull Station
3
Each
K Ln
Pipe & Fittings, 3/4" Copper, Cold Water
0.3
Ft
Public Address Speaker
1
Each
K Ln
Pipe & Fittings, 3/4" Copper, Hot Water
0.3
Ft
Crane, Electric Bridge, <5 Ton
1
Each
K Ln
Pipe Insulation, Cold Water
0.3
Ft
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle