UM = SF
Construction Cost Factor (CCF)
9.87/SF, based on an Engineering Estimate (build out). This is a new FAC this version of the
FPG and sufficient data has not been collected to date. In the interim, a notional facility of 25,000 SF with
200 LF of railroad track (2 lanes of 100 LF each) going into the facility. Costs were based on USACE data
for a Vehicle Maintenance Facility and Railroad Trackage.
Sustainment Cost Factor (SCF)
. 12/SF, the sustainment factor was calculated using a ratio from FAC 2141 (2.08%) as no
other auditable data was available.
No Layout Available