UM = EA
Construction Cost Factor (CCF)
||content||
,160,330.00/EA, based on data provided by USACE. The SF CCF for FAC 2191 was
multiplied by the reference size of 31,000 SF to obtain an EA value. Values were deflated to FY04 $ using
a deflation factor of 0.985.
Sustainment Cost Factor (SCF)
,923.96/EA, the sustainment factor was calculated using a ratio from FAC 2112 (1.20%) as no
other auditable data was available.
No Layout Available