UM = SF
Construction Cost Factor (CCF)
5.78/SF, based on data provided from USACE, and deflated to FY04 $ using a deflation factor
of 0.985
Sustainment Cost Factor (SCF)
.59/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 6,721 SF. Values shown are in FY04 $.
Replacement
Cost:
9,787
Building GSFT: 6,721
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,261
,838
,763
,728
Unscheduled
,160
,876
,862
,808
Renewal &
Replacement:
||content||
,009
,022
,877
Total M&R Costs:
,421
,723
,647
,413
As % of replacement:
0.66%
0.89%
1.39%
1.78%
Per gsft:
||content||
.30
.03
.59
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
3436
Sq Ft
Water Heater, Gas/Oil 75 Gph
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
2736
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
15
Each
Pipe & Fittings, 4" DWV PVC
0.2
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
2
Each
Roof Drain, 4-6"
2
Each
Steel, Painted, Exterior Door
4
Each
1
Each
Metal Roof
5076
Sq Ft
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Steel, Painted, Interior Door
10
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
2
Each
Variable Air Volume Box
4
Each
Concrete Interior Steps
36
Sq Ft
Air Conditioner, Rooftop, 5 Ton
2
Each
Metal Interior Railing, Painted
23
Ln Ft
Fan Coil, Two-Pipe, 400 Cfm
2
Each
Concrete Block, Painted, Interior Wall Finish
6366
Sq Ft
Direct Digital Controls, System Points
1
Each
Concrete, Finished Flooring
6542
Sq Ft
Fire Sprinkler Head
21
Each
Acoustical Tile, Dropped, Ceiling
1523
Sq Ft
Distribution Panel Board
2
Each
Metal Unpainted Interior Ceiling
5018
Sq Ft
Distribution Switch, Fused, <600 V
2
Each
Drinking Fountain, Refrigerated
1
Each
Motor Starter, 5-20 HP, <600 V
2
Each
Emergency Eye Wash
1
Each
Fluorescent Lighting Fixture, 160w
54
Each
Metal Halide Lighting Fixture, High Bay,
Lavatory, Vitreous China
4
Each
400w
8
Each
Service Sink, Iron Enamel
1
Each
Receptacle, 120V, 15 Amp
58
Each
2
Each
Wiring Device, Switch
22
Each
Tankless Water Closet
4
Each
Fire Alarm Bell, 6"
2
Each
Urinal, Vitreous China
1
Each
Fire Alarm Control Panel
1
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
0.2
Ft
Manual Pull Station
5
Each
K Ln
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
Ft
Public Address Speaker
1
Each
K Ln
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
Ft
Crane, Electric Bridge, <5 Ton
1
Each
K Ln
Pipe Insulation, Cold Water
0.2
Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle