UM = SF
Construction Cost Factor (CCF)
1.99/SF, based on data provided from USACE, and deflated to FY04 $ using a deflation factor
of 0.985
Sustainment Cost Factor (SCF)
.01/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 2,679 SF. Values shown are in FY04 $.
Replacement
Cost:
3,601
Building GSFT: 2,679
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,027
,449
,483
,449
Unscheduled
||content||
,912
,513
,598
,553
Renewal &
Replacement:
0
,317
,738
Total M&R Costs:
,939
,762
,398
,740
As % of replacement:
1.12%
1.63%
2.38%
3.03%
Per gsft:
||content||
.47
.15
.14
.01
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
760
Sq Ft
Tankless Water Closet
3
Each
Concrete Block, Painted, Exterior, 1st Floor
1627
Sq Ft
Urinal, Vitreous China
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
1295
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.2
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
4
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
27
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
2
Each
Pipe Insulation, Cold Water
0.2
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
0
Each
Water Heater, Electric 52 Gal.
1
Each
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Built-up Roof
670
Sq Ft
Pipe & Fittings, 4" DWV PVC
0.1
K Ln Ft
Metal Roof
1517
Sq Ft
Roof Drain, 4-6"
1
Each
Steel, Painted, Interior Door
5
Each
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
1
Each
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Wood, Solid Core, Painted, Interior Door
1
Each
Variable Air Volume Box
3
Each
Concrete Interior Steps
11
Sq Ft
Air Conditioner, Rooftop, 5 Ton
1
Each
Metal Interior Railing, Painted
11
Ln Ft
Fire Sprinkler Head
10
Each
Concrete Block, Painted, Interior Wall Finish
3783
Sq Ft
Distribution Panel Board
3
Each
Sheetrock, Unstippled, Interior Wall Finish
199
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Concrete, Finished Flooring
2626
Sq Ft
Motor Starter, 5-20 HP, <600 V
1
Each
Acoustical Tile, Dropped, Ceiling
541
Sq Ft
Fluorescent Lighting Fixture, 160w
25
Each
Metal Halide Lighting Fixture, High Bay,
Metal Ceiling, Painted
584
Sq Ft
400w
2
Each
Metal Unpainted Interior Ceiling
1500
Sq Ft
Receptacle, 120V, 15 Amp
42
Each
Sheetrock, Unstippled, Ceiling
0
Sq Ft
Wiring Device, Switch
14
Each
Drinking Fountain, Refrigerated
1
Each
Fire Alarm Bell, 6"
1
Each
Emergency Eye Wash
1
Each
Fire Alarm Control Panel
1
Each
Lavatory, Vitreous China
4
Each
Manual Pull Station
5
Each
Service Sink, Iron Enamel
1
Each
Crane, Electric Bridge, <5 Ton
1
Each
1
Each
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle