UM = SF
Construction Cost Factor (CCF)
2.72/SF, based on data from TriService & AFCESA, and adjusted to FY04 $ using a OSD
published factors. FAC is comprised of 3 different category codes. Based on recent inventory data each
category code was costed separately and the FAC value derived by a weighted measure.
Sustainment Cost Factor (SCF)
.28/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 5,824 SF. Values shown are in FY04 $.
Replacement
Cost:
6,426
Building GSFT: 5,824
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,134
,184
,149
,080
Unscheduled
,987
,478
,497
,406
Renewal &
Replacement:
||content||
,660
,467
,462
Total M&R Costs:
,121
,321
,113
,948
As % of replacement:
1.11%
1.61%
2.56%
3.01%
Per gsft:
||content||
.56
.28
.62
.28
Component
Quantity
UM
Component
Quantity
UM
Clay Brick, Exterior, 1st Floor
1593
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
0.8
K Ln Ft
Clay Brick, Exterior, 2nd Floor
1593
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.5
K Ln Ft
Clay Brick, Exterior, 3rd+ Floor
1595
Sq Ft
Pipe Insulation, Cold Water
0.9
K Ln Ft
Aluminum Operable Window, 24 sf, 1st Floor
21
Each
Pipe Insulation, Hot Water
0.5
K Ln Ft
Aluminum Operable Window, 24 sf, 2nd Floor
43
Each
Water Heater, Gas/Oil 175 Gph
1
Each
Aluminum Operable Window, 24 sf, 3rd+ Floor
43
Each
Pipe & Fittings, 10" Cast Iron
0.1
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
1
Each
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Steel, Painted, Exterior Door
4
Each
Pipe & Fittings, 4" DWV PVC
0.1
K Ln Ft
Single-Ply Modified Bituminous/Thermoplastic Roof
1943
Sq Ft
Roof Drain, 4-6"
2
Each
Wood, Hollow Core, Painted, Interior Door
54
Each
Pipe & Fittings, 4" Steel, Gas
0.4
K Ln Ft
Wood, Solid Core, Painted, Interior Door
41
Each
Chemical Feed System
1
Each
Concrete Interior Steps
105
Sq Ft
Circulation Pump 5 HP, Hot Water
1
Each
Metal Interior Railing, Painted
58
Ln Ft
Expansion Tank, 60 Gal.
1
Each
Concrete Block, Painted, Interior Wall Finish
1342
Sq Ft
Gas Boiler, 250 Mbh
1
Each
Sheetrock, Unstippled, Interior Wall Finish
8000
Sq Ft
Variable Air Volume Box
4
Each
Carpet, Nylon 20 oz., Low Traffic
5067
Sq Ft
Air Conditioner, Rooftop, 5 Ton
2
Each
Ceramic Tile Flooring
466
Sq Ft
Fire Sprinkler Head
40
Each
Concrete, Finished Flooring
291
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Sheetrock, Unstippled, Ceiling
5824
Sq Ft
Motor Starter, 5-20 HP, <600 V
2
Each
Drinking Fountain, Vitreous China
3
Each
Fluorescent Lighting Fixture, 160w
55
Each
Lavatory, Vitreous China
24
Each
Receptacle, 120V, 15 Amp
121
Each
Service Sink, Iron Enamel
3
Each
Wiring Device, Switch
48
Each
16
Each
Fire Alarm Bell, 6"
3
Each
Tankless Water Closet
7
Each
Manual Pull Station
3
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Smoke Detector
14
Each
Pipe & Fittings, 2" Copper, Cold Water
0.5
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle