Project Name
Project Number
TEMF
Statement of Work
UFC 4-214-02, 24 Jul 03
Floor: epoxy coating on concrete
Base: none
Interior side of exterior walls: painted concrete masonry units or painted concrete to vehicle
door height; prefinished metal liner panels above. Exposed structure shall be painted.
Interior walls and partitions: painted concrete masonry units or painted concrete.
Ceiling: prefinished metal liner panels on underside of roof purlins; exposed structure shall be
painted. Ceiling/roof height shall allow bridge crane hook height of [6000 mm] [for 7 metric ton
crane] [7600 mm] [for 32 metric ton crane]. [Edit as applicable; if the 32 metric ton crane is
required on one wing of repair bays, and the 7 metric ton crane on the other wing of bays, the
building height and heated volume may be reduced by allowing a lower roof height on the bays
with the smaller crane. Visual effect of differing roof heights should also be considered].
2-2.1.2.5 Other requirements: Electrical receptacles shall be minimum 610 mm above floor
(refer to Chapter 9). Provide continuous 150 mm wide trench drains along full width of bays at
exterior doors; locate drains approximately 1000 mm from inside face of exterior walls. Provide
solid trench drain cover 1600 mm wide at personnel doors; provide continuous grating at
remainder of drain. Personnel doors shall be provided with vision lites and exit hardware.
2-2.1.4
Welding Shop. One-half of one repair bay shall be dedicated to welding shop area;
net area is included in provided repair bay area [Delete this paragraph if user organization is not
authorized welders]. Provide acoustical concrete masonry unit partitions to define perimeter of
shop; locate partitions on column centerlines and at bay centerline. Masonry thickness shall be
as required to comply with applicable codes, but not less than 200 mm thick. Masonry partitions
shall terminate 200 mm above ceiling, and shall be braced to building structure; bracing shall
not project into the overhead (crane space) of the surrounding bay areas. Provide acoustical
metal panel ceiling at minimum [___] above floor slab in the half bay dedicated as a welding
shop. Ceiling installation shall not impede operation of the overhead bridge crane. Exterior
wall of shop shall be the repair bay exterior wall, including the 7400 mm wide x 4300 mm high
overhead door at exterior wall (refer to repair bay criteria). Provide personnel egress doors as
required by applicable codes. One personnel access door shall open to adjacent circulation
bay.
2-2.1.4.1 Function: welding on vehicles and equipment. [verify function with user].
2-2.1.4.2 Adjacency requirements: Adjacent to circulation bay, repair bays and/or scheduled
maintenance bay. Adjacent to hardstand vehicle access aisles.
2-2.1.4.3 Furnishings/Fixtures/Equipment: Provide minimum of 2 compressed air outlets in the
shop. Provide electrical power to accommodate user furnished welding equipment (welding
equipment is not in contract) [Include power, and other criteria for user provided equipment].
Floor: epoxy coating on concrete
Base: none
Walls: Acoustical concrete masonry units. Exposed structure shall be painted.
Ceiling:. Prefinished acoustical metal panel ceiling. [Government will consider alternate
materials for ceiling construction providing an equivalent barrier. The responsibility to prove
equivalency with a prefinished acoustical metal panel ceiling shall rest with the offeror at
proposal stage.]
2-2.1.4.5 Other requirements: Electrical receptacles shall be minimum 610 mm above floor
SOW-13