UFC 4-721-11.1, UEPH Complexes, 26 Nov 01
those which exceed the minimum requirements of the Statement of Work. Submit as part of the Design-
Technical Information.
(3) Equipment Schedule. Equipment schedule shall indicate proposed type of equipment, size or
capacities, manufacturer, and model number. Furnish manufacturer's catalog data on equipment and
fixtures for all features of the facilities, this shall include appliances, electrical equipment and lighting,
mechanical heating and cooling equipment, domestic water system equipment, as well as catalog
information on the finishes and architectural specialties and exterior finish materials. Originals of
manufacturer's catalog should be submitted in lieu of reproducibles to ensure legible data. Submit as
part of the Design-Technical Information.
(4) Color Boards. Coordinated interior and exterior color schemes. For proposal evaluation provide
one copy of the scheme complete with samples and/or chips of the colors, materials, textures, and
(5) Life Safety Analysis. The proposal shall include a Life Safety Analysis which clearly demonstrates
that the proposal meets or exceeds all requirements of the Statement of Work and reference standards
with respect to Life Safety and Fire Protection.
(6)
||content||
\ The Offeror's shall include in their proposal a preliminary ranking of the sustainable design
considerations included in the proposal. This ranking shall be either a LEED (Leadership in Energy and
Environmental Design, by the U.S. Green Building Council) or a SPiRiT (Sustainable Project Rating Tool,
by the U.S. Army Corps of Engineers) ranking. The successful proposal shall be required to complete a
detailed analysis on the final design which meets or exceeds the preliminary ranking established at
proposal level. Proposals must score at least a Bronze SPiRiT Level or a Certified LEED Level. /1/
(7) Evaluation Factors/Proposal Contents Listing. A spreadsheet or table consisting of all the evaluation
categories and sub-categories listed in Section 0120 for technical proposal evaluation and specific
reference to where in the proposal documents those requirements are addressed or indicated. Submit
as part of the Design-Technical Information.
4.0 RESTRICTIONS
a. Incomplete proposals. Failure to submit all the data indicated in this section may be cause for
determining a proposal incomplete and, therefore, not considered for technical evaluation in Phase 2, or
for subsequent award.