UM = SF
Construction Cost Factor (CCF)
3.96/SF, based on data from USACE, and deflated to FY04 $ using a deflation factor of 0.985
Sustainment Cost Factor (SCF)
.20/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 1,602 SF. Values shown are in FY04 $.
Replacement
Cost:
Building GSFT: 1,602
4,604
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
||content||
,047
||content||
,300
||content||
,262
||content||
,248
Unscheduled
||content||
,203
||content||
,473
||content||
,461
||content||
,437
Renewal &
4
,729
,042
Replacement:
Total M&R Costs:
,250
,327
,452
,727
As % of replacement:
1.05%
1.55%
2.54%
3.14%
Per gsft:
||content||
.40
.08
.40
.20
Quantit
Quantit
Component
y
UM
Component
y
UM
Clay Brick, Exterior, 1st Floor
1643
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
0.3
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 1st Floor
24
Each
Pipe & Fittings, 3/4" Copper, Hot Water
0.3
K Ln Ft
Steel, Painted, Exterior Door
1
Each
Pipe Insulation, Hot Water
0.3
K Ln Ft
Wood, Solid Core, Painted, Exterior Door
1
Each
Water Heater, Electric 52 Gal.
1
Each
Single-Ply Modified Bituminous/Thermoplastic Roof
1602
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Wood, Solid Core, Painted, Interior Door
8
Each
Pipe & Fittings, 4" DWV PVC
0.5
K Ln Ft
Ceramic Tile Wall Finish
402
Sq Ft
Roof Drain, 4-6"
1
Each
Plaster Interior Wall Finish
2009
Sq Ft
Air Conditioner, Window, 2 Ton
1
Each
Sheetrock, Stippled, Interior Wall Finish
1607
Sq Ft
Fire Sprinkler Head
8
Each
Wallpaper Interior Wall Finish
1477
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Carpet, Nylon 20 oz., Low Traffic
1282
Sq Ft
Distribution Panel Board
1
Each
Concrete, Finished Flooring
81
Sq Ft
Emergency Lighting Pack, 2 Light w/ Battery
2
Each
Quarry Tile Flooring
240
Sq Ft
Exit Lighting Fixture, w/ Battery
2
Each
Plaster Ceiling
1602
Sq Ft
Fluorescent Lighting Fixture, 160w
17
Each
Drinking Fountain, Refrigerated
1
Each
Receptacle, 120V, 15 Amp
30
Each
Lavatory, Vitreous China
4
Each
Wiring Device, Switch
7
Each
Service Sink, Iron Enamel
1
Each
Fire Alarm Bell, 6"
1
Each
Tankless Water Closet
4
Each
Heat Detector
3
Each
Urinal, Vitreous China
2
Each
Manual Pull Station
1
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
Smoke Detector
2
Each
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle