UM = SF
Construction Cost Factor (CCF)
9.00/SF, based on data from TriService #25, and deflated to FY04 $ using a deflation factor of
0.97.
Sustainment Cost Factor (SCF)
.57/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,071 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,121,390
Building GSFT: 7,071
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,469
,466
,096
,096
Unscheduled
,986
,772
,499
,484
Renewal &
Replacement:
||content||
,485
,209
,683
Total M&R Costs:
,455
,723
,804
,262
As % of replacement:
1.11%
1.40%
2.03%
2.25%
Per gsft:
||content||
.77
.22
.23
.57
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
5090
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
K Ln Ft
Aluminum Fixed Window, 24 sf, 1st Floor
12
Each
Pipe Insulation, Cold Water
0.4
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
3
Each
Pipe Insulation, Hot Water
0.2
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Water Heater, Electric 52 Gal.
1
Each
Steel, Painted, Exterior Door
2
Each
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Built-up Roof
7071
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Wood, Solid Core, Painted, Interior Door
7
Each
Pipe & Fittings, 4" DWV PVC
0.1
K Ln Ft
Acoustical Interior Wall Tile
1189
Sq Ft
Roof Drain, 4-6"
2
Each
Concrete Block, Painted, Interior Wall Finish
4850
Sq Ft
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Sheetrock, Unstippled, Interior Wall Finish
6660
Sq Ft
Variable Air Volume Box
4
Each
Carpet, Nylon 20 oz., High Traffic
884
Sq Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete, Finished Flooring
884
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
1
Each
Rubber Tile Flooring
1768
Sq Ft
Fire Sprinkler Head
35
Each
Acoustical Tile, Dropped, Ceiling
6187
Sq Ft
Circuit Breaker, Main, 600 V, 800 Amp., 3 Ph.
1
Each
Metal Ceiling, Painted
884
Sq Ft
Distribution Panel Board
2
Each
Drinking Fountain, Refrigerated
1
Each
Motor Starter, 5-20 HP, <600 V
24
Each
Lavatory, Vitreous China
2
Each
Fluorescent Lighting Fixture, 160w
88
Each
Service Sink, Iron Enamel
1
Each
Receptacle, 120V, 15 Amp
48
Each
Sink, Stainless Steel
1
Each
Wiring Device, Switch
12
Each
Tankless Water Closet
4
Each
Fire Alarm Control Panel
1
Each
Urinal, Vitreous China
2
Each
Heat Detector
4
Each
Pipe & Fittings, 2" Copper, Cold Water
0.4
K Ln Ft
Manual Pull Station
4
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.4
K Ln Ft
Smoke Detector
11
Each
Annual Sustainment Costs
.00
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle