Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
Base: resilient base
Walls: painted gypsum wallboard or painted veneer plaster
Ceiling: suspended acoustical panel ceiling, painted gypsum wallboard, or painted veneer plaster.
2-3.1.6.5 Other requirements: Door(s) shall have classroom function (F84) lockset.
2-3.1.7
Administrative Area Corridor. Provide as required to allow circulation to building
spaces, and comply with applicable code egress requirements. Unless otherwise required,
minimum corridor width shall be 1829 mm [6'-0"]. Administrative area corridor shall be capable
of being secured from exterior entrances and from any adjacent public, unsecure corridors.
2-3.1.7.1 Function: Circulation and means of egress.
2-3.1.7.2 Adjacency requirements: Adjacent to entry vestibule, and vertical circulation (where
occurs). Corridor(s) shall provide access to administrative area spaces and shall provide
circulation between administrative spaces and supply spaces. Corridor may directly link a
company's administrative area to its supply area; or the company's administrative area corridor
may provide access to a public, unsecure corridor that provides access to the supply areas of
all companies in the building.
2-3.1.7.3 Furnishings/Fixtures/Equipment (FFE): Provide one handicap accessible electric
water cooler. Provide fire extinguishers in semi-recessed fire extinguisher cabinets to comply
with applicable codes.
Floor: porcelain tile, quarry tile, or vinyl composition tile.
Base: porcelain tile, quarry tile, or resilient cove base.
Walls: impact resistant gypsum wallboard with painted finish.
Ceiling: suspended acoustical panel ceiling, painted gypsum wallboard, painted veneer plaster, or
painted Portland cement plaster.
2-3.1.7.5 Other requirements: [Add security and locking requirements for corridor doors].
2-3.1.8
Waiting Area. Provide one area, approximately 10.2 m2 [110 sf] incorporated into
the Administrative Area Corridor. Occupants: Two or more visitors; additional visitors (e.g.
those waiting to attend a large meeting in the conference room) will wait in the adjacent corridor.
2-3.1.8.1 Function: Waiting and reception area for company soldiers and visitors. Control
point for access to admin office and conference room.
2-3.1.8.2 Adjacency requirements: Adjacent to, or very close to, entry vestibule; reception
desk should be easily seen by visitors entering the building. Waiting Area is open to
Administrative Area Corridor.
2-3.1.8.3 Furnishings/Fixtures/Equipment (FFE): Provide two side chairs [verify seating
requirement with user]. Provide one 1219 mm high x 1829 mm wide [4'-0" x 6'-0"] wall mounted
bulletin board.
2-3.1.8.4 Finishes: Match Administrative Area Corridor.
2-3.1.8.5 Other requirements:
SOW-26