Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
equipment. Size and locate rooms to allow equipment removal and maintenance; room area shall
be minimum of 1.1 % of the building area served, however, minimum dimensions for each
communication room shall be 2134 mm x 3048 mm [7'-0" x 10'-0"]. Provide minimum of one
communication room per floor.
2-2.4.8.1 Function: Telephone and data network support spaces for the UEPH building.
2-2.4.8.2 Adjacency requirements: Locate to allow efficient distribution. Communication rooms
on upper floors shall be vertically stacked above each other. Communication rooms shall not be
used for storage or other purposes; access will be limited to authorized personnel.
2-2.4.8.3 Furnishings/Fixtures/Equipment: As required by Statement of Work.
Base: resilient cove base, or none.
Walls: painted gypsum wallboard or painted veneer plaster, or painted concrete masonry units
Ceiling: painted gypsum wallboard, painted veneer plaster, or suspended acoustical panel ceiling,
or painted underside of concrete structure above
2-2.4.8.5 Other requirements: Communication service to the building shall be underground.
Provide minimum 914 mm [3'-0"] wide door with storeroom function (F86) lockset. Provide floor
openings and vertical shaft spaces as necessary. Provide a minimum of three 102 mm [4"] diameter
empty conduits between vertically stacked communication rooms.
2-2.4.9
Boot Wash Areas. Provide paved exterior boot wash area at each entrance to the
UEPH building. Design area for use by one soldier at a time.
2-2.4.9.1
Function: Exterior area for washing footgear prior to entering building.
2-2.4.9.2 Adjacency requirements: Locate on ground floor, adjacent to each entrance to the UEPH
building.
2-2.4.9.3 Furnishings/Fixtures/Equipment: Provide drainage assembly: Removable 914 mm x 914
mm aluminum or stainless steel grating, with non-slip surface, supported by concrete storm
drainage inlet box. Box shall be filled with stone and filter material to trap sediment . Filtered runoff
shall be piped to storm drainage system. Provide freeze-proof wall hydrant with aerator nozzle
mounted approximately 400 mm above grating, control valve mounted at 800 mm above pavement.
Provide 3'-0" long metal grab bar above control valve, mounted at 1067 mm above pavement. Top
of grating and concrete structure shall align with adjacent concrete sidewalk. Provide concrete
sidewalk between boot wash area and entrance sidewalk.
2-2.4.9.4 Finishes: refer to exterior building material requirements.
2-2.4.9.5 Other requirements: Provide adequate drainage away from building.
2-2.4.10 Outside Storage Building. Provide one separate, enclosed, weatherproof storage
building, minimum 6 m2 [65 sf]. [If consistent with requirements of IDG, prefabricated storage
building may be used in lieu of site-constructed storage building. If this option is added, revise
building material requirements below.]