Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
Ceiling: suspended acoustical panel ceiling
2-4.10.1.5 Other requirements: Handicap accessible.
2-4.10.2 Entry Vestibules. Provide at each exterior entrance to lobby/main corridor area. [If
climate dictates, revise this sentence to require vestibules at all entrances to the building.]
2-4.10.1.1 Function: Primary entry point into the facility; weather protection for interior spaces.
2-4.10.1.2 Adjacency requirements: Adjacent to lobby/main corridor.
2-4.10.1.3 Furnishings/Fixtures/Equipment:
Floor: Provide recessed entry mat full depth of vestibule x full width of doors; porcelain tile, or
quarry tile in remainder of room.
Base: porcelain tile or quarry tile
Walls: Match exterior wall finish material, or painted gypsum wallboard, or painted veneer plaster
Ceiling: painted gypsum wallboard, painted veneer plaster, or painted Portland cement plaster.
2-4.10.1.5 Other requirements: Handicap accessible.
2-4.10.2 Interior Stairs. Provide as required to allow circulation to upper floor of the building,
and to comply with applicable code egress requirements.
2-4.10.2.1 Function: Circulation and means of egress.
2-4.10.2.2 Adjacency requirements: Adjacent to corridors. Connects all floors of the building.
2-4.10.2.3 Furnishings/Fixtures/Equipment: Stairs shall be steel construction with concrete-filled
treads, or cast-in-place concrete construction. Open risers are prohibited. Provide mechanical
and electrical systems to comply with applicable codes.
Landing floor: porcelain tile, quarry tile, resilient tile, vinyl composition tile, or sealed concrete.
Base: porcelain tile, quarry tile, or resilient cove base.
Treads: porcelain tile, quarry tile, resilient treads, or sealed concrete. Provide slip-resistant nosing
if tile is used.
Risers: painted steel, porcelain tile, quarry tile, or sealed concrete.
Walls: painted gypsum wallboard, or painted concrete masonry units.
Ceiling: suspended acoustical panel ceiling, painted gypsum wallboard, painted veneer plaster, or
painted Portland cement plaster.
2-4.10.2.5 Other requirements: Stairs shall comply with handicap accessibility requirements of
applicable codes. Railings shall be painted steel, or prefinished aluminum.
2-4.10.3 Men's Toilet Room(s). Provide one or more rooms, sized to accommodate the
number of plumbing fixtures required for each battalion served. In a two-story structure, one of
the required toilet fixtures and one of the required lavatories shall be provided in a single
occupant male toilet room on the second floor. If two battalion headquarters are combined in
one building, the required number of fixtures may be combined in one male toilet room on each
SOW-55