accomplishment, will determine the pre-design con-
individual activities can be established using a
cepts and development strategies that satisfy the
method similar to the one for rating existing opera-
requirements of selected functional activities. In gen-
tions. Table 5-7 outlines the individual functional
eral, the identification of project priorities and the
areas that may require improvement and the upgrad-
establishment of pre-design concepts depends on
ing activities to be accomplished. In order to simplify
a consideration of the upgrading alternatives
the use of the table in conjunction with the example
described in Table 5-6.
designs in Chapter 6, functional activity code num-
bers are provided for each space. FoIlowing each
(4) Individual Activity Requirements The specific
functional activity and its code number are ratings
type and number of individual activities requiring
of existing conditions indicating the most appropriate
upgrading will depend on an evaluation of their con-
upgrading option for a given field condition. In gen-
formity to essential functional requirements and
eral, upgrading options depend both on the specific
minimum operating standards. An estimate of the
locational constraints for a given project and on the
extent and character of upgrading requirements for
condition of existing facilities.
Table 5-7
Upgrading Requirements for Individual
Functional Activities