UM = SF
Construction Cost Factor (CCF)
3.00/SF, based on data provided from TriService, #8/2 and deflated to FY04 $ using a
deflation factor of 0.97.
Sustainment Cost Factor (SCF)
.97/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 7,500 SF. Values shown are in FY04 $.
Replacement
Cost:
||content||
,108,125
Building GSFT: 7,500
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,519
,261
,116
,091
Unscheduled
,435
,273
,190
,143
Renewal &
Replacement:
||content||
,142
,671
,077
Total M&R Costs:
,953
,676
,977
,312
As % of replacement:
0.81%
1.06%
1.62%
2.01%
Per gsft:
||content||
.20
||content||
.55
.40
.97
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Painted, Exterior, 1st Floor
3630
Sq Ft
Water Heater, Gas/Oil 75 Gph
1
Each
Steel, Painted, Exterior Finish, 2nd Floor
2890
Sq Ft
Pipe & Fittings, 6" Cast Iron
0.2
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
16
Each
Pipe & Fittings, 4" DWV PVC
0.25
K Ln Ft
Steel Double 12'x24', Painted, Roll-up Door
4
Each
Roof Drain, 4-6"
2
Each
Steel, Painted, Exterior Door
8
Each
Sump Pump, 3 HP
1
Each
Metal Roof
5664
Sq Ft
1
Each
Steel, Painted, Interior Door
11
Each
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Wood Frame, Fully Glazed, Painted, Interior Door
2
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
4
Each
Concrete Interior Steps
40
Sq Ft
Variable Air Volume Box
4
Each
Metal Interior Railing, Painted
24
Ln Ft
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete Block, Painted, Interior Wall Finish
6725
Sq Ft
Direct Digital Controls, System Points
1
Each
Concrete, Finished Flooring
7300
Sq Ft
Fire Sprinkler Head
23
Each
Acoustical Tile, Dropped, Ceiling
1700
Sq Ft
Distribution Panel Board
2
Each
Metal Unpainted Interior Ceiling
5600
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Drinking Fountain, Refrigerated
1
Each
Motor Starter, 5-20 HP, <600 V
6
Each
Emergency Eye Wash
1
Each
Fluorescent Lighting Fixture, 160w
60
Each
Metal Halide Lighting Fixture, High Bay,
Lavatory, Vitreous China
4
Each
400w
9
Each
Service Sink, Iron Enamel
1
Each
Receptacle, 120V, 15 Amp
61
Each
2
Each
Wiring Device, Switch
23
Each
Tankless Water Closet
4
Each
Fire Alarm Bell, 6"
2
Each
Urinal, Vitreous China
1
Each
Fire Alarm Control Panel
1
Each
K Ln
Pipe & Fittings, 2" Copper, Cold Water
0.2
Ft
Manual Pull Station
4
Each
K Ln
Pipe & Fittings, 3/4" Copper, Cold Water
0.2
Ft
Public Address Speaker
1
Each
K Ln
Pipe & Fittings, 3/4" Copper, Hot Water
0.2
Ft
Crane, Electric Bridge, <5 Ton
2
Each
K Ln
Pipe Insulation, Cold Water
0.2
Ft
Annual Sustainment Costs
.00
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle