UM = SF
Construction Cost Factor (CCF)
3.07/SF, based on data provided from USACE and TriService. This FAC has numerous
category codes from the Army, Navy and Marine Corps. An analysis of the inventory was done, costs
calculated at the catcode level, weighted in accordance with the inventory splits and values deflated to
FY04 $ using a deflation factor of 0.97.
Sustainment Cost Factor (SCF)
.28/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 11,670 SF. Values shown are in FY04 $.
Replacement
Building GSFT:
Cost:
11,670
||content||
,181,938
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,830
,473
,436
,367
Unscheduled
,799
,549
,605
,514
Renewal &
Replacement:
||content||
,539
,801
,722
Total M&R Costs:
,629
,560
,842
,603
As % of replacement:
0.90%
1.15%
1.77%
2.25%
Per gsft:
||content||
.16
||content||
.79
.28
Component
Quantity
UM
Component
Quantity
UM
Concrete Block, Exterior, 2nd Floor
1441
Sq Ft
Pipe & Fittings, 2" Copper, Cold Water
0.5
K Ln Ft
Concrete Block, Painted, Exterior, 1st Floor
4726
Sq Ft
Pipe & Fittings, 3/4" Copper, Cold Water
0.4
K Ln Ft
Steel, Painted, Exterior Finish, 2nd Floor
2523
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.3
K Ln Ft
Aluminum Fixed Window, 12 sf, 1st Floor
1
Each
Pipe Insulation, Cold Water
0.5
K Ln Ft
Steel Frame, Painted, Operable Window, 12 sf, 2nd Floor
14
Each
Water Heater, Electric 52 Gal.
1
Each
Steel Double 12'x24', Painted, Roll-up Door
3
Each
Pipe & Fittings, 6" Cast Iron
0.3
K Ln Ft
Steel Single 12'x12', Painted, Roll-up Door
1
Each
Pipe & Fittings, 4" DWV PVC
0.4
K Ln Ft
Steel, Painted, Exterior Door
1
Each
Roof Drain, 4-6"
2
Each
Built-up Roof
3501
Sq Ft
1
Each
Metal Roof
6169
Sq Ft
Pipe & Fittings, 3/4" Copper, Oxygen
0.1
K Ln Ft
Steel, Painted, Interior Door
11
Each
Exhaust Fan, Roof Mounted, 5000 Cfm
1
Each
Wood Frame, Fully Glazed, Painted, Interior Door
2
Each
Variable Air Volume Box
7
Each
Wood, Solid Core, Painted, Interior Door
2
Each
Air Conditioner, Rooftop, 20 Ton
1
Each
Concrete Interior Steps
44
Sq Ft
Fan Coil, Two-Pipe, 400 Cfm
2
Each
Metal Interior Railing, Painted
21
Ln Ft
Fire Sprinkler Head
62
Each
Concrete Block, Painted, Interior Wall Finish
9465
Sq Ft
Distribution Panel Board
3
Each
Sheetrock, Unstippled, Interior Wall Finish
733
Sq Ft
Distribution Switch, Fused, <600 V
1
Each
Concrete, Finished Flooring
11321
Sq Ft
Motor Starter, 5-20 HP, <600 V
3
Each
Vinyl Tile Flooring
131
Sq Ft
Fluorescent Lighting Fixture, 160w
92
Each
Metal Halide Lighting Fixture, High Bay,
Acoustical Tile, Dropped, Ceiling
2132
Sq Ft
400w
10
Each
Metal Unpainted Interior Ceiling
9189
Sq Ft
Receptacle, 120V, 15 Amp
82
Each
Sheetrock, Unstippled, Ceiling
131
Sq Ft
Wiring Device, Switch
27
Each
Drinking Fountain, Refrigerated
1
Each
Fire Alarm Bell, 6"
4
Each
Emergency Eye Wash
1
Each
Fire Alarm Control Panel
1
Each
Lavatory, Vitreous China
7
Each
Manual Pull Station
6
Each
Service Sink, Iron Enamel
1
Each
Smoke Detector
7
Each
1
Each
Crane, Electric Bridge, <5 Ton
1
Each
Tankless Water Closet
6
Each
Crane, Electric Bridge, >15 Ton
1
Each
Urinal, Vitreous China
2
Each
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle