UM = EA
Construction Cost Factor (CCF)
,658,097.65/EA, based on data provided by USACE. The facilities in this FAC were estimated
to be similar in design, function and size as those in FAC 1496, so the same factors were used. Values
were deflated to FY04 $ using a deflation factor of 0.985.
Sustainment Cost Factor (SCF)
8,488.43/EA, the sustainment factor was calculated using a ratio from FAC 2141 (2.08%) as
no other auditable data was available.
No Layout Available