Cost Factors ($FY04)
Inventory records
Code
Title
UM
Description
Construction
Sustainment
Upper limit
Reset Value
EA
5,455.63
,930.65
1
1
A facility for testing guided missiles. Cost factors are based upon a 250' high tower. CCF is
derived from Marshall & Swift data. SCF is derived from RS Means data.
.31
300,000
10,000
SF
6.99
A facility in which guided missiles are assembled and/or maintained at the depot level. CCF is
derived from AFCESA data. SCF is derived using the Whitestone M ARS based on the DoD
average size of 20,337 SF.
SF
8.20
.37
40,000
25,000
A facility for the specialized maintenance and assembly of intercontinental ballistic missiles.
CCF is based o n Navy data. SCF is derived using the Whitestone MARS based on the
individual facility types within the FAC.
SF
0.51
.02
250,000
65,000
A facility into which a ship can be floated and the water removed, to allow for maintenance
and repair of areas usually underwater. CCF is derived from Navy data. SCF is based on the
ratio for FAC 1511.
7.52
1
1
EA
,514.72
A facility consisting of rollers on which a ship may be hauled out of the water along an
inclined track. Cost factors are based upon a 100' long track, with rails 78.5" wide. Does not
include the cost of the sled upon which the vessel is carried. CCF is derived from USACE
data. SCF is based on the ratio for FAC 8601.
SF
2.14
||content||
.83
350,000
5,000
A facility designed to house ship component maintenance, repair, and inspection activities.
CCF is derived from USACE data. SCF is derived using the Whitestone MARS based on the
DoD average size of 17,167 SF.
SF
3.07
.28
300,000
4,000
A facility designed to support ship component maintenance, repair, and inspection activities.
CCF is derived from USACE and TriService data. SCF is derived using the Wh itestone
MARS based on the DoD average size of 11,670 SF.
EA
,658,097.65
8,488.43
1
1
A washing facility for marine landing craft. Cost factors are based upon a facility with 16
stations and wash water recycling. CCF is derived from USACE data. SCF is based on the
ratio for FAC 2141.
SF
0.56
.47
70,000
11,000
A facility for the maintenance and repair of nuclear/radioactive items. CCF is derived from
USACE data. SCF is derived using the Whitestone MARS based on the DoD average size of
15,455 SF.
EA
,953,937.40
,484.65
2
1
A facility with a movable boom to hoist heavy objects for ship repair and maintenance
activities. CCF is derived from data from all the Services. SCF is derived using Navy data.
SF
3.00
.97
450,000
4,000
inspection activities. CCF is derived fro m TriService #8B. SCF is derived using the
Whitestone MARS based on the DoD average size of 7,500 SF.
SF
3.00
||content||
.98
450,000
4,000
inspection activities at the depot level. CCF is derived from TriService #8B. SCF is derived
using the Whitestone MARS based on the DoD average size of 22,831 SF.
SF
2.83
.59
150,000
7,500
inspection activities of National Guard units. CCF is derived from USACE data. SCF is
derived using the Whitestone MARS based on the DoD average size of 5,898 SF.
SF
2.83
.51
150,000
4,000
inspection activities of Reserve units. CCF is derived from TriService data. SCF is derived
using the Whitestone MARS based on the DoD average size of 6,161 SF.
EA
,757.23
||content||
,488.76
30
1
A facility, other than a building, designed to support land vehicle and vehicle component
maintenance, repair, and inspection activities. Cost factors based on an average-sized
grease/wash rack of 1,626 SF. CCF is derived from USACE data. SCF is derived using the
Whitestone MARS based on the DoD average size of 1,626 SF.
25
DOD FACILITIES PRICING G UIDE Version 6