UM = SF
Construction Cost Factor (CCF)
3.51/SF, based on data from USACE, and deflated to FY04 $ using a deflation factor of 0.985
Sustainment Cost Factor (SCF)
.23/SF, using the Whitestone MARS and a component list derived from the DoD typical
inventory size of 3,019 SF. Values shown are in FY04 $.
Replacement
Cost:
Building GSFT: 3,019
3,637
M&R Average Annual Cost Forecasts
Current Year
5 Year
20 Year
50 Year
PM & Minor Repair:
,124
,701
,452
,429
Unscheduled
,208
,778
,611
,582
Renewal &
8
,479
,794
Replacement:
Total M&R Costs:
,333
,596
,542
,805
As % of replacement:
1.28%
1.54%
2.74%
3.81%
Per gsft:
.10
.52
.49
.23
Component
Quantity
UM
Component
Quantity
UM
Stucco, Exterior, 1st Floor
1870
Sq Ft
Pipe & Fittings, 3/4" Copper, Hot Water
0.3
K Ln Ft
Aluminum Fixed Window, 24 sf, 1st Floor
14
Each
Pipe Insulation, Cold Water
0.7
K Ln Ft
Aluminum Frame, Fully Glazed, Exterior Door
3
Each
Pipe Insulation, Hot Water
0.3
K Ln Ft
Steel, Painted, Exterior Door
2
Each
Water Heater, Gas/Oil 75 Gph
1
Each
Clay Tile Roof
3670
Sq Ft
Pipe & Fittings, 10" Cast Iron
0.2
K Ln Ft
Wood, Solid Core, Painted, Interior Door
13
Each
Pipe & Fittings, 6" Cast Iron
0.4
K Ln Ft
Ceramic Tile Wall Finish
242
Sq Ft
Pipe & Fittings, 4" DWV PVC
0.26
K Ln Ft
Sheetrock, Unstippled, Interior Wall Finish
921
Sq Ft
Pipe & Fittings, 4" Steel, Gas
0.2
K Ln Ft
Vinyl Interior Wall Finish
4570
Sq Ft
Exhaust Fan, Roof Mounted, 10,000 Cfm
1
Each
Concrete, Finished Flooring
377
Sq Ft
Air Conditioner, Rooftop, 5 Ton
2
Each
Quarry Tile Flooring
2642
Sq Ft
Fire Sprinkler Head
15
Each
Acoustical Tile Ceiling
906
Sq Ft
Distribution Panel Board
1
Each
Wood Finished Ceiling
2770
Sq Ft
Distribution Switch, Fused, <600 V
3
Each
Drinking Fountain, Refrigerated
1
Each
Motor Starter, 5-20 HP, <600 V
2
Each
Lavatory, Vitreous China
8
Each
Fluorescent Lighting Fixture, 160w
37
Each
Service Sink, Iron Enamel
1
Each
Receptacle, 120V, 15 Amp
35
Each
Sink, Stainless Steel
2
Each
Wiring Device, Switch
9
Each
Tankless Water Closet
7
Each
Manual Pull Station
2
Each
Urinal, Vitreous China
2
Each
Smoke Detector
6
Each
Circulator Pump, 1/12 HP, Hot Water
1
Each
2
Each
Pipe & Fittings, 2" Copper, Cold Water
0.7
K Ln Ft
Commercial Walk-In Freezer/Cooler
1
Each
Pipe & Fittings, 3/4" Copper, Cold Water
0.7
K Ln Ft
Annual Sustainment Costs
.00
.00
.00
.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49
50 Year Life Cycle