Project Name
Project Number
UEPH Complex
Statement of Work
26 November 2001
Floor: porcelain tile, or ceramic tile.
Base: porcelain tile, or ceramic tile.
Walls: ceramic tile, or 1829 mm high ceramic tile wainscot with painted impact resistant gypsum
wallboard or painted concrete masonry units above.
Ceiling: painted Portland cement plaster, or painted gypsum wallboard or veneer plaster.
2-5.8.3.5 Other requirements:
2-5.8.4
Shower Room. Provide two. Rooms shall be used by able-bodied military personnel
only. Rooms shall be accessed from corridor. Showers shall not be combined with toilet rooms.
2-5.8.4.1 Function: Private shower and dressing room for use by brigade staff.
2-5.8.4.2 Adjacency requirements: Adjacent to corridor. Near toilets.
2-5.8.4.3 Furnishings/Fixtures/Equipment: Provide one ceramic tile shower with rod and
shower curtain. Shower shall have ceramic soap holder and wall mounted grab bar. Dressing
area shall have bench, four towel/robe hooks, and wall mounted full-length mirror. Provide floor
drain at dressing area, locate outside of circulation path.
Floor: ceramic tile.
Base: ceramic tile.
Walls: ceramic tile
Ceiling: painted Portland cement plaster.
2-5.7.5.5 Other requirements:
Janitor Closet. Provide one. Minimum area: 2.3 m2 [25 sf]. Room shall be accessed
2-5.8.5
from corridor.
2-5.8.5.1 Function: Sink and storage of cleaning supplies, soap, paper products.
2-5.8.5.2 Adjacency requirements: Near toilets and shower rooms.
2-5.8.5.3 Furnishings/Fixtures/Equipment: Provide one floor mounted mop sink, mop rack for
two mops, and minimum 1524 linear mm of wall mounted stainless steel shelving.
Floor: ceramic tile, or sealed concrete
Base: resilient cove base, or ceramic tile base
Walls: painted water-resistant gypsum wallboard, or painted concrete masonry units
Ceiling: painted gypsum wallboard, painted veneer plaster, or painted Portland cement plaster
2-5.8.5.5 Other requirements: Door shall have classroom function (F84) lockset.
Storage. Provide minimum 4.6 m2 [50sf] of general storage space. Storage room
2-5.8.6
will be accessed from the corridor.
SOW-75